1
![Slide 1](thumbs/i01.jpg)
Base of the heater. It is important to get it in the correct spot! | 2
![Slide 2](thumbs/i02.jpg)
Base side channels are in place and Udo (on the left) is working on the connecting rear channel. | 3
![Slide 3](thumbs/i03.jpg)
Connecting channel is complete. Notice the chimney connection hole. | 4
![Slide 4](thumbs/i04.jpg)
Vidas, Udo and Norbert install the fire box floor. | 5
![Slide 5](thumbs/i05.jpg)
The firebox is being started. Also, the water loop is in place. |
6
![Slide 6](thumbs/i06.jpg)
The firebox is coming along. Notice the firebox is composed of an inner and
outer part. In this picture only one layer of the inner firebox is complete. | 7
![Slide 7](thumbs/i07.jpg)
The firebox lintel is in place. Also the right middle side channel is installed. | 8
![Slide 8](thumbs/i08.jpg)
The heater gets higher. | 9
![Slide 9](thumbs/i09.jpg)
The base of the bake oven is in place. | 10
![Slide 10](thumbs/i10.jpg)
The bake oven is complete. |
11
![Slide 11](thumbs/i11.jpg)
All the side channels are set. | 12
![Slide 12](thumbs/i12.jpg)
View of the top and back of the bake oven. | 13
![Slide 13](thumbs/i13.jpg)
The fiberglass matt is attached. This acts as a slip joint so that the core can move up and down (due to the high temperatures) without cracking the facing. | 14
![Slide 14](thumbs/i14.jpg)
The finished front face of the heater core. | 15
![Slide 15](thumbs/i15.jpg)
The finished rear side of the heater core. |
16
![Slide 16](thumbs/i16.jpg)
The finished side of the heater core. Notice the bypass - used to help the draft during startup. |